Home/Zeigo Activate

Zeigo Activate

2024 → 2025Product walkthroughs

By Schneider Electric

Zeigo Activate asks a company about its sites and energy systems and returns a dated decarbonization roadmap, instead of weeks with a consultant. I was design lead: I designed the Plan module, wrote the Zeus components it runs on and coded its charts in React and TypeScript.

sSituation

Before: spreadsheet, PDF and consultant

Utility PDFs, Excel and a third party to calculate each site. They knew their footprint, not what to do first: the product had to answer that.

aAction · Decision 1

Ask per site, incomplete not blocked

Without knowing which boiler is at which site, there's no recommendation, and nobody answers 30 questions for eight sites in one sitting. One question per system, site by site, and the roadmap exists anyway and improves as you add sites.

aAction · Decision 2

A path ordered by effort

A calculation exposed as a table can't be walked through, and a filterable catalog hands prioritization back to the user. The roadmap is a 2022 → 2030 path with 4 categories ordered by effort: from what's free to what you buy.

View the product walkthroughs

aAction · Decision 3

From document to tracker

Clients didn't want to read the plan; they wanted to mark what they'd done. A status per project and per site, on every row, so you come back to log progress, not to read.

rResult

A roadmap in ~20 minutes

A roadmap went from ~3 weeks with a consultant to ~20 minutes self-serve, and wizard completion from 41% to 68%. In the 2024 redesign I designed and coded an interactive waterfall in React + TypeScript, one block per project from baseline to target.

View the prototypeView source data · Mixpanel · wizard funnelView source data · team tracking · time to first roadmap
Research notes: general tasks and frustrationsA third party processes the data → the roadmapEach site needs its own strategy
Select a Site: completion per siteEach site shows its %: you see what's leftBack to the roadmap; finish another day
Activate roadmap: 2022 → 2030 with four categoriesQuick Fixes first: what costs nothing2022 to 2030: a plan you walk
Energy Efficiency projects with status per siteA status on every row: the plan reflects progressStatus per site: each site moves differently
My Roadmap generated from the wizard answersBuilt from the wizard answers, editable anytime45 recommendations, progress tracked as projects close

“Working with X has been great. He is reliable and fast. The solutions he designs are creative and empathetic to the end-user experience!”

Stefanos BezanisStefanos Bezanis · Senior Product Manager, Zeigo (Schneider Electric)
Open fullscreenGeneral Tasks:Frustrations:
01 / 13Frames onlyOpen fullscreen
Before · how it started01Spreadsheet, PDF and consultant

Utility PDFs, Excel and a third party to calculate each site.

Utility PDFs, Excel and a third party to calculate each site.

Getting a decarbonization roadmap used to mean hiring a consultant and waiting weeks for a document that went stale the moment a site changed. We turned it into a wizard: a company answers questions about its sites and energy systems, and the product returns a dated roadmap with projects, costs, savings and a projection of its own emissions to 2030.

A timeline with a chart, editable tables and per-row state cannot be judged in a static frame. So I built a working roadmap and deployed it, and that prototype became the testing instrument — every research guide points at it. We ran numbered experiments on a written pipeline: research guide, prototype, tests, analysis, insight report, user stories, sprints.

What I'd do differently: build the roadmap as an editable object from day one. Everything the redesign added — removing projects, comparing impact, tracking progress — is agency we retrofitted onto something that started read-only. The client sessions told us that in the first year; the architecture took until the second to allow it.

aAction · research · 10

Who we designed for

Activate reaches small and medium-sized companies through Schneider Electric's channel: IT resellers and solution providers who sell it as a subscription next to their own offer. So there were always two audiences: the company's sustainability or facilities owner, who has a target and no in-house decarbonization expertise, and the partner who has to demo the product. Large companies also use it to push Scope 3 reporting down their supply chain.

Primary persona
Jordan Taylor, 42, Head of Sustainability at EcoTech Manufacturing: an SME with 10 US sites. Strong on Scope 1 and 2, weak on site-level energy analysis, new to Activate.
Secondary persona
The site or facility manager Jordan invites to enter each site's energy data.
Their goal
"Reduce emissions to satisfy our partners and the media, while also finding cost-saving opportunities."
Their frustration
Finding specific data for each site, inconsistent invoice formats and calendars, standards that keep changing, and every site needing its own strategy.

The persona settled a question for the team: the Activate user is an SME, not a large enterprise. That is why the wizard can't assume an energy analyst on the other side.

Primary persona on the FigJam board: Jordan Taylor, Head of Sustainability, 10 US sites

aAction · research · 11

The input: an engagement problem

Before designing anything, the team mapped the current task and set it against two dated product slides. The roadmap didn't come from a hunch; it came from engagement measured on the platform.

Slide 9 Sep 2024
All premium users: "Generally not engaged with platform. Issue with engagement as a whole."
Slide 27 Jan 2025
ZCP only: "Missing value prop."
How they used it
Primary: emission reporting. Secondary: cost and efficiency.
The task today
Utility PDFs → Excel → a third party to process → emissions per site, summed by company → a target from partners, SBTi and online guides.
The problem, in their words
"Don't know what direction to take · Don't know how to reach that target · Don't have a timeline · Don't know who to work with."
  • —Compounding experience: good site data = good targets = good roadmap = good actions. The roadmap is only as good as the targets, and the targets only as good as the site data.
  • —Labour illusion: people value things more when they see the work that went into them.
  • —Do the work for them: generate the best-case scenario first, so the tool starts as good news.
  • —Value in personalisation: the user's goal is to reduce emissions, not to use a roadmap tool.
  • —Live data: as the data matures, so does the roadmap.

Design principles as written on the FigJam board "Zeigo Ideation :: 2025", page Activate // Roadmap.

Task analysis: the current process, the dated product slides and the design principles

aAction · framing · 12

Assumptions we put on trial

The hypothesis fit in one sentence: if we ask the right questions about a company's sites and energy systems, we can generate the roadmap a consultant would, dated and costed, and keep it alive as the company acts on it. Under it sat five assumptions, written down so they could fail.

  • —The user is already confident in the target they set.
  • —The user needs help on how to reach that target.
  • —The user will see value in the roadmap before using it.
  • —The user will upgrade to a Pro subscription to get it.
  • —The user will follow the guided roadmap experience.

With the engineers I didn't ask "can we build this screen". I asked "what can this system actually calculate, and from what". The client sessions ran alongside the PM, Stefanos Bezanis.

aAction · build · 13

Build: each number is its own calculation

The roadmap has a projection line, a per-project ROI, a completion count per category and a growth-adjusted emissions figure. Each is a different computation with a different input. Designing the screen before knowing which ones the system could return meant renegotiating it afterwards, so I designed the UI from what the calculation produced, and the questions from what it needed.

Stack
React + TypeScript on Next.js, on the Zeus components I wrote (React + tokens; full account in the Zeus case).
What I coded
Screens in the Plan module and the data visualisation: the emissions projection chart (Scope 1 / Scope 2 stacked, with projection lines), the roadmap timeline, the KPI row and the project tables.
How it shipped
As my PRs, merged through the team's normal review.
The KPI row
Projects completed · years until goal · expected 2030 emissions with business growth · emissions target · last 12 months · emissions to go. Six numbers, six calculations.
Project Tracker
One card per category with estimated cost, yearly savings, return on investment, energy savings, completion and estimated emissions reduction.
Roadmap creation in Figma: target, the six KPIs, the 2022 → 2030 path, behavioural changes and the Project Tracker

aAction · design · 14

The Plan module in Figma: 18 sections

The page "Plan | Roadmap" in the Activate Compositions file is where the module lives. Not all of it is the happy path: three sections are only about leaving, coming back and editing, because nobody finishes this in one sitting.

Wizard
Company-level questions, then per-energy-system questions, frames 1.0 → 1.30, plus a full run with every energy system selected.
Leaving and returning
*Leaving wizard without complete*, *Incompleted sites*, *Edit Roadmap Wizard Answers*.
Target
*Target Set* and *New Target*: Top Recommendations, Custom Target and the generated chart.
Roadmap
*Roadmap creation*, *Roadmap tracking* (11 frames) and a prototype component.
Categories
Detail pages for Energy Efficiency, Renewables and Carbon Offsets, plus *Add Custom Project*.
2024 redesign
*Initiatives on Roadmap*: financial, filters, empty roadmap, project and roadmap states.

On the category pages every project row carries a status (Not Interested, Planning, In Progress, Completed), the sites it applies to and an "add info" field, with an estimated reduction range on each card.

Energy Efficiency projects: Lighting, Compressed Air and Steam Boilers, each row with status and sites

aAction · validate · 15

Experiments with a number and a date

Each round of testing had an ID and a place on a timeline: `#002` branched into `#002-01` (sessions `-01`, `-02`, `-03`), then `#002-02` and `#003-01`. The board dates the steps: project assigned on 12 March, tests on 12 May, analysis on 14 May (2025).

  • —Short and focused: "We don't have to test everything at once." One experiment, one question.
  • —Observe, don't ask: "we are not the users and users are not designers", so the setup removes our bias.
  • —Development is expensive: test before the sprint, focus the build on what adds value.
  • —Reference: Airbnb's experimentation culture, pinned on the board.

Tickets in Jira; supporting material in Schneider's SharePoint.

Experiment timeline: research guide → prototype → tests → analysis → insight report → stories → sprints → MVP

aAction · validate · 16

A guide with correct answers

I wrote the scenario guides. Each task has a start, an end and, where possible, the correct answer, so a session tells you whether the screen communicates, not just whether people like it. In `#002-01` the tester is a sustainability manager chasing 100% reduction by 2050, with four sites already profiled.

1 · First look
Scroll without clicking and say what the tool will help you do.
2 · Target
Name the configured target. Correct answer: 83 tCO2e.
3 · Business as usual
Total annual emissions of all sites in 2050 if nothing is installed; then for sites 1 and 2.
4 · Add a site
A fifth site emitting 5,000 tCO2e is missing: add it.
5 · Renewables focus
Set the roadmap to renewables only, explain which projects got applied, the total cost ($262,500) and the 2030 emissions.
6–7 · Projects
Add a window replacement; test a microgrid for sites 1 and 3 and say whether, and when, you hit the target.
8–9 · Reading
Explain gap to target, project cost, ROI, energy saving, reduction per dollar and scenario confidence; then what frustrates you.

`#002-02` repeated the structure against an 80%-by-2040 target on four different sites: a manufacturing plant, a warehouse, an office building and a Boston plant. Every guide links to the same deployed prototype.

Research guide #002-01: scenario, tasks and expected answers, pointing at the Vercel prototype

aAction · validate · 17

What 21 sessions showed

I moderated sessions and shared the analysis with the team; part of the research feeding the module came from them. Each task got the same three columns: what we saw, what it means, insight. The 21 session analyses are dated 20 and 21 May 2025.

What held
Navigation: people read left to right starting from the sites column, reached the business-as-usual number without friction and customised preset scenarios easily. They also recognised the design consistency with other platforms: Zeus doing its job.
What broke
Reading the data. Units were inconsistent between chart, KPIs and project totals. The target line was hard to find, and a percentage reduction got confused with an absolute figure.
Gap to target
Nobody could tell whether it meant time or emissions.
Category vs. project
Indistinguishable, so total cost stopped making sense. One tester couldn't find the microgrid and added it as a custom project instead.
Toggle vs. delete
Several confused switching a project off with deleting it, and adding a site gave no confirmation.

Strategic takeaway written in the analysis: "Improve data literacy support: design for users who may not be data experts… Design for confidence."

Analysis of #002-01: three sessions per task, then what we saw, what it means and the insight

aAction · iterate · 18

Legibility before features

After the test the work stopped being about adding things and became about making the calculation readable. The navigation didn't need a redesign; the numbers needed to explain themselves.

Changed
Explicit axis labels, legends and units; context text next to each visualisation; a tooltip per KPI; one unambiguous definition of gap to target; categories visually separated from projects.
Into the backlog
Recurring projects (a lighting replacement isn't a one-off) and Net Present Value as the cost metric, because both came in the users' own vocabulary.
Also asked for
A project search, several scenarios side by side, documented growth assumptions and more methodological transparency.
Left open
Testers couldn't make a corporate-level call without budget and cashflow information. That's a product decision, not a design fix.

Earlier client sessions had already pushed the biggest change: from document to tracker. The process around it: Figma branches for design, Git branches for code, Storybook as the shared review surface, Jira for tickets. We reviewed the prototype with the PM before writing tickets, so the discussion happened on something that ran.

rResult · 19

Results

Activate launched publicly in October 2023 and is live with clients in the US and EU. In September 2024 Schneider moved it to freemium with Zeigo Activate Lite: baseline, targets and Scope 1/2 are free, and the personalised roadmap sits in the Pro plan. The module in this case is the paid differentiator.

to a first roadmap, from ~3 weeks with a consultant
~20 min
roadmap wizard completion (Mixpanel)
41% → 68%
recommendations per account, across 4 categories
45
Cost to the client
From a consultancy engagement to included in the product.
Research
21 testing sessions analysed on the code prototype (FigJam, 20–21 May 2025).
After launch
The roadmap became a tracker: each project marked Not Interested, Planning, In Progress or Completed per site, so the plan shows what the company actually did.
Built on it
3 products: HUB, Power (EAC) and Network.

Sources: team tracking (time to roadmap), Mixpanel (wizard completion), product data (recommendations), Schneider press release of 18 Sep 2024 (Lite and Pro).

View source data · Mixpanel · wizard funnelView source data · team tracking · time to first roadmap

rResult · team · 20

The base for the rest of Zeigo

Activate is what the rest of the suite came out of. Zeus was born here and then carried HUB and Network. The energy-data import pattern also started in Activate and moved to HUB, where it replaced a six-step survey (see the HUB case).

Renewables → Power
The Renewables page is where Activate hands a company over to Zeigo Power (EAC): fleet electrification, green tariffs for the US, the EU and elsewhere, PPAs, onsite solar and Energy Attribute Certificates with a rate per country.
Who uses it
Zeigo clients in the US and EU; internally, the design and front-end teams across four products.
Renewables projects: green tariffs, PPA, onsite solar and EACs, the bridge to Zeigo Power

rResult · learnings · 21

What I learned

The first roadmap was a reading surface more than a working one. The 2024 brief said it plainly: users wanted to see impact per project, remove the projects they'd never do and compare options.

  • —Design what the system computes. Asking engineering what the system can calculate, and from what, was worth more than any early mockup of the roadmap.
  • —The incomplete state is the product. With per-site data, partial is the normal case; designing it as an error would have meant a roadmap nobody ever saw.
  • —Navigation can pass while meaning fails. The sessions showed people moving fine and still misreading units, the target line and the gap. A test with correct answers is what caught it.
  • —Prototype in code when the screen moves. A timeline with a chart, editable tables and per-row state needed something that ran; that prototype is still public.
  • —Where I feel most at home: in code, because I can try something, put it in front of real users and see if it holds. Leading design here, the only way to know whether a screen was honest was to run the calculation behind it.

rResult · next · 22

What stayed open

The October 2024 brief listed more than the redesign covered on screen, and testing raised questions design alone couldn't close.

  • —Budget and cashflow: testers needed them to decide at a corporate level. A product call, still open.
  • —Several scenarios at once: customising one preset worked; comparing many side by side was asked for and not resolved.
  • —From the brief: a row view of projects with check / uncheck and a MAAC curve with a slider.
  • —From the backlog: recurring projects, Net Present Value and a project search.

“Working with X has been great. He is reliable and fast. The solutions he designs are creative and empathetic to the end-user experience!”

Stefanos BezanisStefanos Bezanis · Senior Product Manager, Zeigo (Schneider Electric)
Previous caseZeus Design SystemSchneider Electric · 2022 → 2026Next caseZeigo PowerSchneider Electric · 2025

Exelobaiza | Design Engineer

ENES
███████╗██╗  ██╗███████╗██╗      ██████╗ ██████╗  █████╗ ██╗███████╗ █████╗
██╔════╝╚██╗██╔╝██╔════╝██║     ██╔═══██╗██╔══██╗██╔══██╗██║╚══███╔╝██╔══██╗
█████╗   ╚███╔╝ █████╗  ██║     ██║   ██║██████╔╝███████║██║  ███╔╝ ███████║
██╔══╝   ██╔██╗ ██╔══╝  ██║     ██║   ██║██╔══██╗██╔══██║██║ ███╔╝  ██╔══██║
███████╗██╔╝ ██╗███████╗███████╗╚██████╔╝██████╔╝██║  ██║██║███████╗██║  ██║
╚══════╝╚═╝  ╚═╝╚══════╝╚══════╝ ╚═════╝ ╚═════╝ ╚═╝  ╚═╝╚═╝╚══════╝╚═╝  ╚═╝
# Zeigo Activate ## Schneider Electric — 2024 → 2025 --- [Product walkthroughs](https://www.youtube.com/playlist?list=PLsSa2oaki_7LOYqqEVOywewpN5r8EXqnn) Context: Getting a decarbonization roadmap meant hiring a consultant and waiting weeks. Activate is a subscription product that asks a company about its sites and energy systems and **returns a dated roadmap**: projects, costs, savings and a projection of its own emissions to 2030. My role: I was **design lead**. I designed the Plan module in Figma, wrote the Zeus components it runs on in **React and TypeScript on Next.js**, and built the data visualisation — the emissions projection chart, the roadmap timeline, the KPI row and the project tables — as PRs that merged through the team's review. I also ran research hands-on: I built the testing prototype, wrote the scenario guides and moderated sessions. Impact: A roadmap went from **~3 weeks with a consultant to ~20 minutes self-serve**, and wizard completion from **41% to 68%**. Activate became the base the rest of the suite was built on: HUB, Power (EAC) and Network. When Schneider moved the product to freemium, the **personalised roadmap is what sits behind the paid tier**. Before · how it started: They knew their footprint; the plan came from PDFs, Excel and a consultant. - Spreadsheet, PDF and consultant: Utility PDFs, Excel and a third party to calculate each site. They knew their footprint, not what to do first: the product had to answer that. - Excel: Site emissions summed by hand → the calculation - Consultant: A third party processes data → computed roadmap The idea · the roadmap is calculated: The questions come from what the calculation needs; the screen, from what it returns. - One question per system: Five questions per system and per site stall the start. One question per system; the detail gets filled in once you're in. - Cognitive load · 1: One question per system, not five - Progressive disclosure: Each system's detail comes once you're in - Mental model · system: Envelope, lighting, HVAC: what sites know - Ask per site: Without knowing which boiler is at which site, there's no recommendation. Company-level questions first, then site-level, with visible progress. - Progressive disclosure: Company first, sites after - System status · %: What's left: nobody finishes in one go - User control · back: Back to the roadmap, nothing lost - Incomplete, not blocked: Nobody answers 30 questions for eight sites in one sitting. The roadmap exists anyway and improves as you add sites. - System status: Each site shows its %: you see what's left - Recognition · action: See Summary if done, Select Site if not - User control · back: Back to the roadmap; finish another day - A target that projects: Setting a target without seeing what it means for your emissions. Pick strategy, year and %, and the projection is calculated from it. - User control · target: You set the target, not a template - System status: Scope 1 and 2 with your target's curve - Ordered by effort: A calculation exposed as a table can't be walked through. A 2022 → 2030 path with 4 categories ordered by effort. - Mental model · path: 2022 to 2030: a plan you walk - Hierarchy · effort: From what's free to what you buy - Status · KPIs: Each number is a separate calculation - Progressive disclosure: Tasks only when you open a category After · from document to tracker: Clients didn't want to read the plan; they wanted to mark what they'd done. - Status per project and site: The roadmap was a surface to read, not to work on. A status per project and per site, on every row. - User control · status: The plan reflects what the company did - Proximity · site: Status per site: each site moves differently - Recurring use: You come back to log progress, not read Redesign 2024 · progress in sight: The brief asked for better tracking without changing categories or costs yet. - Progress at a glance: Viewing projects was "fairly choppy"; progress didn't read. The same path, with 7/45 progress at a glance. - System status: 7 of 45 recommendations, no row counting - Consistency · 4 cat.: Same 4 categories: the data didn't change The charts · reading the calculation: The 2024 brief and the Scope 3 story asked to see what each part weighs. - An interactive waterfall: The illustrated path didn't show each project's impact. A numerical waterfall, one block per project from baseline to target; I designed it and coded it in React + TypeScript. - Mapping · impact: One block per project, sized by its cut - Progressive disclosure: Hover a bar: name, CO2, cost and time - System status · gap: Ongoing emissions after each project - Control · scenario: Add or remove projects from the roadmap - A renewable target in %: A renewable target needed its own KPIs, not tCO2e. Renewable share per year in %, with the gap to 100% written on the projection. - Mental model · %: Renewable share in %, not tonnes - System status · gap: 77% to go, written on the line itself - Consistency · target: Dashed bar = target, as in other charts - Recognition · RE100: The standard's logo names the commitment - Where Scope 3 comes from: 15 Scope 3 categories, with no way to see which weighs most. Upstream and downstream side by side, a proportional bar per category and no connecting lines, so you can prioritize. - Proximity · two sides: Upstream (1–8) left, downstream (9–15) right - System status · share: Each side in tCO2e and its % of Scope 3 - Hierarchy · bar length: Bar proportional to the category's emissions - Visibility · small: Small and 0.0% categories still show - Consistency · color: Blue upstream, purple downstream, everywhere - Emissions you can read: In sessions, people hovered the chart to guess units. The same lesson applied to Emission Tracking: explicit units, a legend, labeled lines and a tooltip per scope. - Consistency · units: tCO2e on every KPI, as in the tooltip - Mental model · gap: Gap to target in tCO2e, not in time - Recognition · legend: Scope 1, 2, 3 and target named by color - Visibility · lines: Base and Target labeled on the line itself - Disclosure · tooltip: Hover a year: each scope in tCO2e - CDP as the benchmark: Customers used CDP scores as their reference. An industry comparison built on CDP data, shaped together with customers. - Mental model · CDP: Benchmarks on the CDP data they referenced - Consistency · cards: Industry, sector, activity, country: one card - Recognition · rating: Poor, Average or Great vs. the industry - Proximity · vs. avg: Industry average and yours, side by side - Not only color · delta: Arrow and sign, not just red or green - Trust · sample: How many companies the comparison uses Getting a decarbonization roadmap used to mean hiring a consultant and waiting weeks for a document that went stale the moment a site changed. We turned it into a wizard: a company answers questions about its sites and energy systems, and the product returns a dated roadmap with projects, costs, savings and a projection of its own emissions to 2030. A timeline with a chart, editable tables and per-row state cannot be judged in a static frame. So I built a working roadmap and deployed it, and **that prototype became the testing instrument** — every research guide points at it. We ran numbered experiments on a written pipeline: research guide, prototype, tests, analysis, insight report, user stories, sprints. **What I'd do differently:** build the roadmap as an editable object from day one. Everything the redesign added — removing projects, comparing impact, tracking progress — is agency we retrofitted onto something that started read-only. The client sessions told us that in the first year; the architecture took until the second to allow it. Action · research · 10 — Who we designed for: Activate reaches small and medium-sized companies through **Schneider Electric's channel**: IT resellers and solution providers who sell it as a subscription next to their own offer. So there were always two audiences: the company's sustainability or facilities owner, who has a target and no in-house decarbonization expertise, and the partner who has to demo the product. Large companies also use it to push Scope 3 reporting down their supply chain. - Primary persona: **Jordan Taylor, 42**, Head of Sustainability at EcoTech Manufacturing: an SME with 10 US sites. Strong on Scope 1 and 2, weak on site-level energy analysis, new to Activate. - Secondary persona: The **site or facility manager** Jordan invites to enter each site's energy data. - Their goal: "Reduce emissions to satisfy our partners and the media, while also finding cost-saving opportunities." - Their frustration: Finding specific data for each site, inconsistent invoice formats and calendars, standards that keep changing, and every site needing its own strategy. The persona settled a question for the team: the Activate user is an SME, not a large enterprise. That is why the wizard can't assume an energy analyst on the other side. ![Primary persona on the FigJam board: Jordan Taylor, Head of Sustainability, 10 US sites](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/research-persona-jordan-taylor.png) Action · research · 11 — The input: an engagement problem: Before designing anything, the team mapped the current task and set it against two dated product slides. The roadmap didn't come from a hunch; it came from **engagement measured on the platform**. - Slide 9 Sep 2024: All premium users: **"Generally not engaged with platform. Issue with engagement as a whole."** - Slide 27 Jan 2025: ZCP only: **"Missing value prop."** - How they used it: Primary: emission reporting. Secondary: cost and efficiency. - The task today: Utility PDFs → Excel → a third party to process → emissions per site, summed by company → a target from partners, SBTi and online guides. - The problem, in their words: "Don't know what direction to take · Don't know how to reach that target · Don't have a timeline · Don't know who to work with." - **Compounding experience:** good site data = good targets = good roadmap = good actions. The roadmap is only as good as the targets, and the targets only as good as the site data. - **Labour illusion:** people value things more when they see the work that went into them. - **Do the work for them:** generate the best-case scenario first, so the tool starts as good news. - **Value in personalisation:** the user's goal is to reduce emissions, not to use a roadmap tool. - **Live data:** as the data matures, so does the roadmap. Design principles as written on the FigJam board "Zeigo Ideation :: 2025", page Activate // Roadmap. ![Task analysis: the current process, the dated product slides and the design principles](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/research-task-analysis.png) Action · framing · 12 — Assumptions we put on trial: The hypothesis fit in one sentence: if we ask the right questions about a company's sites and energy systems, we can generate the roadmap a consultant would, dated and costed, and keep it alive as the company acts on it. Under it sat five assumptions, written down so they could fail. - The user is already confident in the target they set. - The user needs help on how to reach that target. - The user will see value in the roadmap before using it. - The user will **upgrade to a Pro subscription** to get it. - The user will follow the guided roadmap experience. With the engineers I didn't ask "can we build this screen". I asked "what can this system actually calculate, and from what". The client sessions ran alongside the PM, Stefanos Bezanis. Action · build · 13 — Build: each number is its own calculation: The roadmap has a projection line, a per-project ROI, a completion count per category and a growth-adjusted emissions figure. **Each is a different computation with a different input.** Designing the screen before knowing which ones the system could return meant renegotiating it afterwards, so I designed the UI from what the calculation produced, and the questions from what it needed. - Stack: **React + TypeScript on Next.js**, on the Zeus components I wrote (React + tokens; full account in the Zeus case). - What I coded: Screens in the Plan module and the data visualisation: the emissions projection chart (Scope 1 / Scope 2 stacked, with projection lines), the roadmap timeline, the KPI row and the project tables. - How it shipped: As my PRs, merged through the team's normal review. - The KPI row: Projects completed · years until goal · expected 2030 emissions with business growth · emissions target · last 12 months · emissions to go. Six numbers, six calculations. - Project Tracker: One card per category with estimated cost, yearly savings, return on investment, energy savings, completion and estimated emissions reduction. ![Roadmap creation in Figma: target, the six KPIs, the 2022 → 2030 path, behavioural changes and the Project Tracker](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/roadmap-creation.png) Action · design · 14 — The Plan module in Figma: 18 sections: The page "Plan | Roadmap" in the Activate Compositions file is where the module lives. Not all of it is the happy path: **three sections are only about leaving, coming back and editing**, because nobody finishes this in one sitting. - Wizard: Company-level questions, then per-energy-system questions, frames 1.0 → 1.30, plus a full run with every energy system selected. - Leaving and returning: *Leaving wizard without complete*, *Incompleted sites*, *Edit Roadmap Wizard Answers*. - Target: *Target Set* and *New Target*: Top Recommendations, Custom Target and the generated chart. - Roadmap: *Roadmap creation*, *Roadmap tracking* (11 frames) and a prototype component. - Categories: Detail pages for Energy Efficiency, Renewables and Carbon Offsets, plus *Add Custom Project*. - 2024 redesign: *Initiatives on Roadmap*: financial, filters, empty roadmap, project and roadmap states. On the category pages every project row carries a status (Not Interested, Planning, In Progress, Completed), the sites it applies to and an "add info" field, with an estimated reduction range on each card. ![Energy Efficiency projects: Lighting, Compressed Air and Steam Boilers, each row with status and sites](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/energy-efficiency-projects.png) Action · validate · 15 — Experiments with a number and a date: Each round of testing had an ID and a place on a timeline: `#002` branched into `#002-01` (sessions `-01`, `-02`, `-03`), then `#002-02` and `#003-01`. The board dates the steps: project assigned on **12 March**, tests on **12 May**, analysis on **14 May** (2025). - **Short and focused:** "We don't have to test everything at once." One experiment, one question. - **Observe, don't ask:** "we are not the users and users are not designers", so the setup removes our bias. - **Development is expensive:** test before the sprint, focus the build on what adds value. - **Reference:** Airbnb's experimentation culture, pinned on the board. Tickets in Jira; supporting material in Schneider's SharePoint. ![Experiment timeline: research guide → prototype → tests → analysis → insight report → stories → sprints → MVP](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/research-experiment-timeline.png) Action · validate · 16 — A guide with correct answers: I wrote the scenario guides. Each task has a start, an end and, where possible, **the correct answer**, so a session tells you whether the screen communicates, not just whether people like it. In `#002-01` the tester is a sustainability manager chasing **100% reduction by 2050**, with four sites already profiled. - 1 · First look: Scroll without clicking and say what the tool will help you do. - 2 · Target: Name the configured target. Correct answer: 83 tCO2e. - 3 · Business as usual: Total annual emissions of all sites in 2050 if nothing is installed; then for sites 1 and 2. - 4 · Add a site: A fifth site emitting 5,000 tCO2e is missing: add it. - 5 · Renewables focus: Set the roadmap to renewables only, explain which projects got applied, the total cost ($262,500) and the 2030 emissions. - 6–7 · Projects: Add a window replacement; test a microgrid for sites 1 and 3 and say whether, and when, you hit the target. - 8–9 · Reading: Explain gap to target, project cost, ROI, energy saving, reduction per dollar and scenario confidence; then what frustrates you. `#002-02` repeated the structure against an 80%-by-2040 target on four different sites: a manufacturing plant, a warehouse, an office building and a Boston plant. Every guide links to the same deployed prototype. ![Research guide #002-01: scenario, tasks and expected answers, pointing at the Vercel prototype](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/research-guide-002-01.png) Action · validate · 17 — What 21 sessions showed: I moderated sessions and shared the analysis with the team; part of the research feeding the module came from them. Each task got the same three columns: **what we saw, what it means, insight**. The 21 session analyses are dated 20 and 21 May 2025. - What held: Navigation: people read left to right starting from the sites column, reached the business-as-usual number without friction and customised preset scenarios easily. They also recognised the design consistency with other platforms: Zeus doing its job. - What broke: Reading the data. Units were inconsistent between chart, KPIs and project totals. The target line was hard to find, and a percentage reduction got confused with an absolute figure. - Gap to target: Nobody could tell whether it meant time or emissions. - Category vs. project: Indistinguishable, so total cost stopped making sense. One tester couldn't find the microgrid and **added it as a custom project instead**. - Toggle vs. delete: Several confused switching a project off with deleting it, and adding a site gave no confirmation. Strategic takeaway written in the analysis: "Improve data literacy support: design for users who may not be data experts… Design for confidence." ![Analysis of #002-01: three sessions per task, then what we saw, what it means and the insight](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/research-analysis-002-01.png) Action · iterate · 18 — Legibility before features: After the test the work stopped being about adding things and became about **making the calculation readable**. The navigation didn't need a redesign; the numbers needed to explain themselves. - Changed: Explicit axis labels, legends and units; context text next to each visualisation; a tooltip per KPI; one unambiguous definition of gap to target; categories visually separated from projects. - Into the backlog: **Recurring projects** (a lighting replacement isn't a one-off) and **Net Present Value** as the cost metric, because both came in the users' own vocabulary. - Also asked for: A project search, several scenarios side by side, documented growth assumptions and more methodological transparency. - Left open: Testers couldn't make a corporate-level call without budget and cashflow information. That's a product decision, not a design fix. Earlier client sessions had already pushed the biggest change: from document to tracker. The process around it: Figma branches for design, Git branches for code, Storybook as the shared review surface, Jira for tickets. We reviewed the prototype with the PM before writing tickets, so the discussion happened on something that ran. Result · 19 — Results: Activate launched publicly in **October 2023** and is live with clients in the US and EU. In September 2024 Schneider moved it to freemium with **Zeigo Activate Lite**: baseline, targets and Scope 1/2 are free, and **the personalised roadmap sits in the Pro plan**. The module in this case is the paid differentiator. - ~20 min to a first roadmap, from ~3 weeks with a consultant - 41% → 68% roadmap wizard completion (Mixpanel) - 45 recommendations per account, across 4 categories - Cost to the client: From a consultancy engagement to included in the product. - Research: 21 testing sessions analysed on the code prototype (FigJam, 20–21 May 2025). - After launch: The roadmap became a tracker: each project marked Not Interested, Planning, In Progress or Completed per site, so the plan shows what the company actually did. - Built on it: 3 products: HUB, Power (EAC) and Network. Sources: team tracking (time to roadmap), Mixpanel (wizard completion), product data (recommendations), Schneider press release of 18 Sep 2024 (Lite and Pro). Result · team · 20 — The base for the rest of Zeigo: Activate is what the rest of the suite came out of. Zeus was born here and then carried HUB and Network. The energy-data import pattern also started in Activate and moved to HUB, where it replaced a six-step survey (see the HUB case). - Renewables → Power: The Renewables page is where Activate hands a company over to **Zeigo Power (EAC)**: fleet electrification, green tariffs for the US, the EU and elsewhere, PPAs, onsite solar and Energy Attribute Certificates with a rate per country. - Who uses it: Zeigo clients in the US and EU; internally, the design and front-end teams across four products. ![Renewables projects: green tariffs, PPA, onsite solar and EACs, the bridge to Zeigo Power](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/renewables-projects-eac.png) Result · learnings · 21 — What I learned: The first roadmap was a reading surface more than a working one. The 2024 brief said it plainly: users wanted to see impact per project, remove the projects they'd never do and compare options. - **Design what the system computes.** Asking engineering what the system can calculate, and from what, was worth more than any early mockup of the roadmap. - **The incomplete state is the product.** With per-site data, partial is the normal case; designing it as an error would have meant a roadmap nobody ever saw. - **Navigation can pass while meaning fails.** The sessions showed people moving fine and still misreading units, the target line and the gap. A test with correct answers is what caught it. - **Prototype in code when the screen moves.** A timeline with a chart, editable tables and per-row state needed something that ran; that prototype is still public. - **Where I feel most at home:** in code, because I can try something, put it in front of real users and see if it holds. Leading design here, the only way to know whether a screen was honest was to run the calculation behind it. Result · next · 22 — What stayed open: The October 2024 brief listed more than the redesign covered on screen, and testing raised questions design alone couldn't close. - **Budget and cashflow:** testers needed them to decide at a corporate level. A product call, still open. - **Several scenarios at once:** customising one preset worked; comparing many side by side was asked for and not resolved. - **From the brief:** a row view of projects with check / uncheck and a MAAC curve with a slider. - **From the backlog:** recurring projects, Net Present Value and a project search. > "Working with X has been great. He is reliable and fast. The solutions he designs are creative and empathetic to the end-user experience!" — Stefanos Bezanis, Senior Product Manager, Zeigo (Schneider Electric) --- All case studies: [https://www.exelobaiza.dev/work](https://www.exelobaiza.dev/work) (markdown mirror: [work.md](https://www.exelobaiza.dev/work.md)) ## Contact - LinkedIn: https://www.linkedin.com/in/exequiel-lobaiza/ - GitHub: https://github.com/exelobaiza