Home/Zeigo Power

Zeigo Power

2025

By Schneider Electric

Zeigo Power lets dozens of companies buy renewable energy certificates as a group, against one price, in a window that closes on a date. The Purchase Opportunities feature is mine end to end, design and code: the grid, the commitment window, and the six ways a trade can close, in React and TypeScript on Zeus.

Closing a commitment window~2 days<15 min<15 min
Closing scenarios handled in product166
Trade closings needing a support ticket~1 in 4~1 in 20~1 in 20

sSituation

Before: closing lived in email

Price was agreed by email and volumes kept in a sheet; each buyer knew whatever someone emailed them. Now one grid shows all five states, and the cancellation reason is written on the card.

aAction · Decision 1

The window rules, not a cart

Here an order is a commitment that can be rejected, reconciled or refunded, so state lives in a dated window. The panel shows a live countdown, MWh against target, and only the actions legal in that state.

aAction · Decision 2

Closing is the product

A designer alone would ship a happy path and one error. Finalize Trade opens Confirm or Cancel, and each of six outcomes is its own flow, because the money is real and the buyer already paid.

aAction · Decision 3

The refund falls out of the arithmetic

The supplier's final cost can be lower than what buyers paid. Reconciliation came last and forced a second version of Finalize Trade: the screen asks if the price changed, only accepts an equal or lower figure, and the price stack recomputes live.

rResult

From one happy path to six

Closing a commitment window went from ~2 days of email and spreadsheet reconciliation to under 15 minutes in the console. What didn't work: the product never reached the volume it was built for.

View source data · team tracking · time to close a windowView source data · support · tickets per trade closing
Purchase Opportunities grid with open, closed, confirmed and cancelled cardsClosing in 5 days: time is the stateExplains the refund instead of an error code
Opportunity detail with the commitment-window panel openCloses in 3d 2h 47m: time left, liveOnly Edit Window or Finalize Trade while open
Finalize Trade modal with Cancel Trade and Confirm TradeFinalize Trade opens one final forkConfirm or Cancel: one decision, not a menu
Confirm Trade with the price breakdown recomputed5.86 → 3.92: the before stays visibleSays whether the price held or changed
Trade confirmed: Congratulations modal and the dated panelCelebrate a close that moves real moneyGreen and dated: the trade is closed
Open fullscreen
01 / 09Frames onlyOpen fullscreen
Before · closing lived in email01Status on the card

Each buyer knew whatever someone emailed them.

Each buyer knew whatever someone emailed them.

Buying renewable energy certificates as a group means dozens of companies committing volume against one price, in a window that closes on a date. I designed and built the console that runs it — including the five ways it can go wrong.

The method was flow first, literally. Every section of the file opens with its state diagram before a single screen. You cannot design a state machine in prose — you draw it, and then you find the states you missed.

What didn't work: the product did not reach the volume it was built for. The console does what it should — the closing runs in product, the states are covered — but aggregated EAC purchasing never took off at the scale that justified it. The craft is in the work, not in the outcome, and I would rather say that than dress it up.

aAction · discovery · 10

Two sides of one opportunity

This feature didn't start from analytics. Zeigo wanted group EAC purchasing inside the product, and the discovery was in the mechanics: what a commitment window is, what happens when it closes under target, and who eats the difference when the wholesale price moves between the window closing and the trade being confirmed.

EAC Control
The Schneider team that creates opportunities, sets the price ceiling, shares them with organizations, runs the window and closes the trade. The console is theirs: Purchase Opportunities · All Orders · Organizations · Users.
Buyers
Corporate sustainability and procurement teams committing volume. They see the same opportunity, anonymised: every other organization is hidden from their view.
Roles in the system
Buyer, Seller, Agent, Admin, Owner, Auditors.
The buyer we designed for
Not fully educated on EACs, but trusting Schneider. That's why the product explains the instrument instead of assuming it.
The pilot
Invite-only: start with people who were known to buy EACs, and open up later.

The admin view says it at the top of every opportunity: what you see here is what buyers see, except other organizations, which are anonymised or hidden. One screen, two audiences, and the copy keeps the operator aware of both.

Opportunity Details, admin view · the banner on top says what buyers will and won't see · Order Process in 4 steps, LoA, Green-e / CDP / RE100 and the 8-question FAQ below

aAction · discovery · 11

An order is a promise, not a purchase

The buyer pays before the trade exists. So the product had to say, in order and in plain words, what happens to that money at each step, including the step where it comes back. The Order Process component is that contract, written on the opportunity itself:

1 · Set Volume
Set a volume request in MWh to see the total price with fees on an active opportunity.
2 · Submit Payment
Choose a payment method, pay, and get a proof of purchase.
3 · Trade Confirmed
When the opportunity closes, a sourcing agent confirms the trade and issues a Letter of Attestation. If the trade is unsuccessful, the agent cancels it and issues a full refund.
4 · Registry
A Cancellation Statement within the reporting period, and the certificates retired in the registry.
  • —Step 3 is the whole case in one sentence: the failure path is written into the buyer's contract before they pay, so the console had to make that path real.
  • —The trust layer sits under it for the same buyer: the LoA as audit proof until the Cancellation Statement, and credential blocks that say why these EACs hold up in Green-e, CDP and RE100 reporting.

aAction · design · 12

35 sections, each one a flow

The Figma page "Purchase Opportunities" is mine, and it doubled as the spec. It has 35 sections, each opening with its flow diagram before the screens. Grouped by what they cover:

Lifecycle · 7
All stages, scroll, Opportunity Details and all its states, search and sorting, hovers.
Commitment window · 4
Edit Window, Edit Window Cancel, Start Order Window, Reopen Window.
Closing the trade · 6
Confirm Wholesale Price, Confirm with Reconciliation, PO Target NOT reached, Cero Orders, ERROR, Cancel Trade.
Access and sharing · 3
Share with more Organizations, Private → Open, Open → Private.
Orders · 11
Orders tab, statuses, menus, order details, reject order and its errors, notifications when a buyer places or cancels an order.
Archive and drafts · 4
Archive, unarchive, delete a draft, archive a confirmed or cancelled trade.

Six of 35 sections are only about closing. That ratio is the argument of the case: the hard part is not browsing an offer, it's what happens to the money at the end.

The team's questions were answered in place, in dated Notes widgets on the page (the ones on file are from October 2024).

One section, read left to right: window closed → Finalize Trade → Confirm Trade with the price unchanged → Congratulations → the confirmed panel. Notes widgets sit under the screens they answer

aAction · validation · 13

Walkthroughs with real numbers

I walked the flows with the PM and the Power team, the people who brought me in, using real opportunity data instead of lorem ipsum. Real numbers are what make the gaps visible: a price, a target and a list of committed organizations force you to ask what happens when they don't add up.

per MWh, the opportunity's max price
$5.86
MWh target for the window
100,000
organizations it was shared with
31
What we started with
A confirm path and a cancel path.
What the walkthroughs added
PO Target NOT reached and Cero Orders: a window can close under its target and still be closable, or close with nobody in it.
What came last
Confirm with Reconciliation: the confirmed wholesale price doesn't match what the orders were placed at. It was the expensive one to find late.
Close it early
From the pilot requirements: if the demand is there, close the opportunity early and open a new one behind it. That's why Finalize Trade has two ways in, open or closed window.

aAction · design · 14

Six endings, each with its own words

Each outcome is a full flow, and each one ends with a sentence someone had to write. The copy is where the operator learns what the system will and won't let them do with the money.

Confirm Wholesale Price
The agreed cost is unchanged; the field answers "The price remains unchanged." and the trade confirms at what buyers paid.
Confirm with Reconciliation
The agreed cost is lower; the price stack recomputes and the buyer's final price drops with it.
PO Target NOT reached
Finalize Trade is available while the window is open and under target.
Cero Orders
The panel reads "No orders placed yet", and the Finalize Trade modal blocks the confirmation: "At least one order is needed to confirm trade." Cancelling is still possible.
ERROR
Typing a cost above what buyers paid (6.88 against 4.80) stops the flow: "The Final Wholesale Commodity Cost cannot exceed the Initial Wholesale Commodity Cost."
Cancel Trade
"This action is final and cannot be undone." A required reason, picked from a closed list, lands on the buyer's card.
Cero Orders (left): 0 of 100,000 MWh and Confirm Trade blocked until there is at least one order. ERROR (right): the final cost can't exceed what buyers already paid

aAction · design · 14

Five reasons to cancel, and no free text

The reason list is closed on purpose: the feature was first tested with a closed group, so the ways an opportunity could fail were known. Each reason is written for the buyer who will read it on their card, not for the operator:

  • —Couldn't reach a price agreement with the Supplier
  • —Supplier network couldn't source EACs in location, etc
  • —Buyer no longer interested in proceeding with Schneider Electric
  • —Volume of EACs no longer available in the market
  • —EAC type no longer available due to Regulatory Changes

On the grid, the first one becomes: "Unfortunately, we couldn't reach a price agreement with the Supplier. We will issue refunds for any orders that were placed." The reason and the refund arrive together, where the buyer already looks.

PO Target NOT reached (top): two ways of starting the flow, with the window open or closed. Cancel Trade (bottom): Finalize → Cancel → the required reason → the cancelled panel

aAction · design · 15

Reconciliation, the one that came late

At order time the buyer pays against a wholesale commodity cost. By the time the trade is confirmed, the cost agreed with the supplier may be lower. Reconciliation is not a screen you bolt on: it changes what the confirmation step is allowed to do, so the whole Finalize Trade flow got a second version.

First version
Two columns: "Enter the final wholesale commodity cost that was agreed at trade", with the cost the buyer paid ($4.80) as a reminder under the label.
Second version
The screen asks first: "Has the Wholesale Commodity Cost changed?", and only accepts a figure that is the same or below.
What shipped
One column: purchase price on top, final price below. The field starts empty, the stack recomputes live, and the old price stays visible, struck through.
  • —The arithmetic on screen: Wholesale Commodity Cost 4.80 + Zeigo Fee 10% + RECA Fee 1% = Retail Price 5.33; then a Service Fee of 10% lands on a Final Price of $5.86/MWh.
  • —The only legal direction is down. The final cost can only be equal to or below what the buyer paid, because the number may owe the buyer money, never bill them more.
  • —The refund falls out of the arithmetic instead of out of a support ticket, and the operator sees the consequence before committing.
The first version of the price step: two columns, an empty required field, and the Price Breakdown beside it
Confirm with Reconciliation, end to end: the final price drops from $5.86 to $3.92 before the operator confirms

aAction · design · 16

The rest of the state machine

Closing is the core, but a window is alive for days before it closes. Two more parts of the page carry state that touches money: orders, and who can see the opportunity.

Orders
The Orders tab has its statuses, menus, order details, a reject flow with its own error states, and notifications when a buyer places or cancels an order. The biggest section on the page is EAC Control's order detail. Rejecting is part of the design because an order is a commitment that can be turned down.
Access
An opportunity can be private or open, and there are full flows for Private → Open and Open → Private, plus sharing with more organizations. Changing who can see a live commitment changes what has already been committed.
Archive and drafts
Drafts can be deleted; confirmed or cancelled trades can be archived and unarchived.
Orders tab, empty state · "There are no Incoming Orders" · search by order before there is anything to search

aAction · build · 17

Build: the same hands, on Zeus

I built the Purchase Opportunities feature front to back, on Zeus components integrated into Power. Flow diagram → screens → build, with no handoff in between: the person who drew the six endings wrote the code that enforces them.

Stack
React + TypeScript on Next.js, on the Zeus design system.
What I shipped
The opportunity grid and its states, Opportunity Details, the commitment-window panel, the Orders tab with statuses, menus, rejection flow and errors, the checkout / Order Process, archive and drafts.
Power-side components
Form of Payment, Order Process, EAC Purchase Opportunities Card, BUYER and EAC Order List, Commitment Window List, High Level Details, Shared Organizations, PO Extra Information, EAC Type.
Where they live
The file's design system page: 108 components sitting on top of Zeus, so Power shipped without forking the system.

The repo is private, so there is no code to show here. The design side is the 35-section page and the component set above.

The grid built from one card component: Draft, open, closed, Trade Confirmed and cancelled with its reason, side by side

rResult · 18

Results

Before and after the console, as tracked by the team. EAC Control stopped running windows outside the product.

View source data · team tracking · time to close a windowView source data · support · tickets per trade closing
Closing a commitment window~2 days<15 min<15 min
Closing scenarios handled in product166
Trade closings needing a support ticket~1 in 4~1 in 20~1 in 20

rResult · 18

Where each number comes from

Time to close a window
~2 days of email and spreadsheet reconciliation → under 15 minutes in the console · team tracking
Closing scenarios in product
1 (happy path, the rest by support) → 6 · Figma and product
Organizations on one opportunity
Tracked by hand → 31 in product, with their volumes · product data
Closings needing a support ticket
~1 in 4 → ~1 in 20 · support tracking
Explaining the instrument
None in product → LoA + Green-e / CDP / RE100 blocks + an 8-question FAQ · product

The reconciliation case in particular, where the confirmed wholesale price doesn't match the orders placed, went from a manual settlement to a screen. What it didn't fix is volume: the console works, but aggregated EAC purchasing never reached the scale it was built for.

The console is internal and behind login; the before / after figures come from the team's and support's own tracking, with no public source to link.

rResult · 19

Two ends of one journey

Power doesn't stand alone in the suite. Zeigo Activate's Renewables page recommends Energy Attribute Certificates as a decarbonization path; Power is where that recommendation gets executed.

Who uses it
EAC Control operators and the buying organizations on the platform.
What stayed reusable
The Power component set on Zeus: Order Process, Form of Payment, the order and commitment-window lists.
Why it matters for Zeus
A second product shipped on the system without forking it, which is what the token and logo work in Zeus was for.
Zeigo Activate recommends EACs (left); Zeigo Power runs the purchase (right)

rResult · 20

What I'd do differently

Map the money before the screens. Every scenario I found late, reconciliation above all, was a question about what happens to a payment, not about a UI. If I ran it again, I'd write the settlement rules first and let the flows fall out of them.

  • —The failure states were the feature. Six closing sections out of 35 is not defensive design; it's where the money is.
  • —A written reason beats an error code. Deciding that the cancellation sentence belongs on the card, not in an email, was design work an engineer alone would have skipped.
  • —Real numbers find gaps that wireframes hide. The target and zero-order cases only showed up when the walkthroughs used an actual price, target and list of organizations.
  • —Good craft doesn't guarantee volume. The closing runs in product and the states are covered, and the market still didn't take off at the scale that justified it.

Where I feel most at home: in code, because that's where I can build with the most creativity: try something, put it in front of real users and see if it holds. But what drives the work is understanding why we're building it. On Power, that meant learning a market before designing it. You can't draw the six ways a trade closes if you don't understand what money does in each one.

Previous caseZeigo ActivateSchneider Electric · 2024 → 2025Next caseSmart ProductionBayer Cropscience · Q4 2025

Exelobaiza | Design Engineer

ENES
███████╗██╗  ██╗███████╗██╗      ██████╗ ██████╗  █████╗ ██╗███████╗ █████╗
██╔════╝╚██╗██╔╝██╔════╝██║     ██╔═══██╗██╔══██╗██╔══██╗██║╚══███╔╝██╔══██╗
█████╗   ╚███╔╝ █████╗  ██║     ██║   ██║██████╔╝███████║██║  ███╔╝ ███████║
██╔══╝   ██╔██╗ ██╔══╝  ██║     ██║   ██║██╔══██╗██╔══██║██║ ███╔╝  ██╔══██║
███████╗██╔╝ ██╗███████╗███████╗╚██████╔╝██████╔╝██║  ██║██║███████╗██║  ██║
╚══════╝╚═╝  ╚═╝╚══════╝╚══════╝ ╚═════╝ ╚═════╝ ╚═╝  ╚═╝╚═╝╚══════╝╚═╝  ╚═╝
# Zeigo Power ## Schneider Electric — 2025 --- Context: Buying renewable energy certificates as a group means dozens of companies committing volume against one price, in a window that closes on a date. Closing one of those trades was **an email thread and a spreadsheet**. Zeigo Power is the console that does it in product. My role: The **Purchase Opportunities feature is mine end to end, design and code** — the opportunity grid and its states, the commitment-window panel, the Orders tab with its statuses and rejection flows, the checkout, and the six ways a trade can close. Built on Zeus in **React and TypeScript on Next.js**. I was brought onto Power specifically for this. Impact: Closing a commitment window went from **~2 days of email and spreadsheet reconciliation to under 15 minutes** in the console, and the scenarios handled in product went from one happy path to **six**; trade closings that needed a support ticket dropped from about **1 in 4 to 1 in 20**. What did not work: the product never reached the volume it was built for. Before · closing lived in email: Price was agreed by email and volumes kept in a sheet; buyers heard after the fact. - Status on the card: Each buyer knew whatever someone emailed them. One grid with all five states, and the cancellation reason written on the card. - System status · card: Draft, open, closed, confirmed or cancelled. - Visibility · deadline: Closing in 5 days: time is the state. - Nielsen 9 · reason: Explains the refund instead of a code. - Access · lock: It started invite-only; opening up came later. - The window rules: State lives in a dated window, not a cart. Countdown, MWh against target, and only the actions legal in that state. - System status · clock: Closes in 3d 2h 47m: time left, live. - Progress · MWh/target: 30,000 of 100,000 MWh at a glance. - Prevention · actions: Only Edit Window or Finalize Trade while open. - Common region · orders: Each organization with its MWh, in the panel. - Explain the market: Most buyers don't understand the instrument. LoA, Green-e / CDP / RE100 credentials and an 8-question FAQ in product. - Nielsen 10 · FAQ: What vintage means, how long retiring takes. - Trust · credentials: Credible EACs that hold up in an audit. - Trust · LoA: Audit proof until the Cancellation Statement. - Mental model · 4 steps: Volume → payment → trade → registry, in order. The idea · closing is the product: Every way to close is a screen, not an error modal, because the money is real. - One final fork: A designer alone would ship a happy path and one error. Finalize Trade opens Confirm or Cancel, and each of six outcomes is its own flow. - Prevention · final: Warns it can't be undone before you choose. - Hick's law · 2 paths: Confirm or Cancel: one decision, not a menu. - Close it early: Waiting for the date stalls an opportunity with demand. Finalize Trade works while the window is open and under target; close it, open another. - Control · Finalize: Close without waiting if the demand is there. - System status · 30%: The bar shows what's missing before deciding. - Cancel with a reason: Cancelling means refunding people who already paid. A required reason, picked from a closed list of 5, that lands on the buyer's card. - Recognition · 5 picks: Closed list: first tested with a closed group. - Prevention · required: No cancelling without saying why. - Consistency · card: The same reason reaches the buyer's card. The detail · reconciliation: It came last and forced a second version of Finalize Trade. - Ask if it changed: The supplier's final cost can be lower than what buyers paid. The screen asks if it changed and only accepts an equal or lower figure. - Prevention · cap: Equal or lower only: never overcharge. - System status · empty: Starts empty: type the agreed figure. - The live stack: Operators couldn't see the consequence before confirming. One column: purchase price on top, final price below; the stack recomputes and the field answers live. - System status · hint: Says whether the price held or changed. - Visibility · strike: 5.86 → 3.92: the before stays visible. - Prevention · Next: No figure, no next: nothing confirmed blind. - Proximity · fees: Wholesale + Zeigo 10% + RECA 1% under Retail. - Hierarchy · price: The buyer's number, big and last. - Celebrate the close: It's a screen whose job is moving real money. Open with "Congratulations!" and leave the confirmed state, dated, in the panel. - System status · panel: Green and dated: the trade is closed. - Tone · Congratulations: Celebrate a close that moves real money. Buying renewable energy certificates as a group means dozens of companies committing volume against one price, in a window that closes on a date. I designed and built the console that runs it — including the five ways it can go wrong. The method was flow first, literally. Every section of the file opens with its state diagram before a single screen. You cannot design a state machine in prose — you draw it, and then you find the states you missed. **What didn't work:** the product did not reach the volume it was built for. The console does what it should — the closing runs in product, the states are covered — but aggregated EAC purchasing never took off at the scale that justified it. The craft is in the work, not in the outcome, and I would rather say that than dress it up. Action · discovery · 10 — Two sides of one opportunity: This feature didn't start from analytics. Zeigo wanted group EAC purchasing inside the product, and the discovery was in the mechanics: what a commitment window is, what happens when it closes under target, and **who eats the difference** when the wholesale price moves between the window closing and the trade being confirmed. - EAC Control: The Schneider team that creates opportunities, sets the price ceiling, shares them with organizations, runs the window and closes the trade. The console is theirs: Purchase Opportunities · All Orders · Organizations · Users. - Buyers: Corporate sustainability and procurement teams committing volume. They see the same opportunity, **anonymised**: every other organization is hidden from their view. - Roles in the system: Buyer, Seller, Agent, Admin, Owner, Auditors. - The buyer we designed for: Not fully educated on EACs, but trusting Schneider. That's why the product explains the instrument instead of assuming it. - The pilot: Invite-only: start with people who were known to buy EACs, and open up later. The admin view says it at the top of every opportunity: what you see here is what buyers see, except other organizations, which are anonymised or hidden. One screen, two audiences, and the copy keeps the operator aware of both. ![Opportunity Details, admin view · the banner on top says what buyers will and won't see · Order Process in 4 steps, LoA, Green-e / CDP / RE100 and the 8-question FAQ below](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-power/opportunity-details-orders.png) Action · discovery · 11 — An order is a promise, not a purchase: The buyer pays before the trade exists. So the product had to say, in order and in plain words, what happens to that money at each step, including the step where it comes back. The Order Process component is that contract, written on the opportunity itself: - 1 · Set Volume: Set a volume request in MWh to see the total price with fees on an active opportunity. - 2 · Submit Payment: Choose a payment method, pay, and get a proof of purchase. - 3 · Trade Confirmed: When the opportunity closes, a sourcing agent confirms the trade and issues a Letter of Attestation. **If the trade is unsuccessful, the agent cancels it and issues a full refund.** - 4 · Registry: A Cancellation Statement within the reporting period, and the certificates retired in the registry. - Step 3 is the whole case in one sentence: the failure path is written into the buyer's contract before they pay, so the console had to make that path real. - The trust layer sits under it for the same buyer: the LoA as audit proof until the Cancellation Statement, and credential blocks that say why these EACs hold up in Green-e, CDP and RE100 reporting. Action · design · 12 — 35 sections, each one a flow: The Figma page "Purchase Opportunities" is mine, and it doubled as the spec. It has **35 sections**, each opening with its flow diagram before the screens. Grouped by what they cover: - Lifecycle · 7: All stages, scroll, Opportunity Details and all its states, search and sorting, hovers. - Commitment window · 4: Edit Window, Edit Window Cancel, Start Order Window, Reopen Window. - Closing the trade · 6: Confirm Wholesale Price, Confirm with Reconciliation, PO Target NOT reached, Cero Orders, ERROR, Cancel Trade. - Access and sharing · 3: Share with more Organizations, Private → Open, Open → Private. - Orders · 11: Orders tab, statuses, menus, order details, reject order and its errors, notifications when a buyer places or cancels an order. - Archive and drafts · 4: Archive, unarchive, delete a draft, archive a confirmed or cancelled trade. Six of 35 sections are only about closing. That ratio is the argument of the case: the hard part is not browsing an offer, it's what happens to the money at the end. The team's questions were answered in place, in dated Notes widgets on the page (the ones on file are from October 2024). ![One section, read left to right: window closed → Finalize Trade → Confirm Trade with the price unchanged → Congratulations → the confirmed panel. Notes widgets sit under the screens they answer](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_10393,h_2678/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-01-confirm-wholesale-price.png) Action · validation · 13 — Walkthroughs with real numbers: I walked the flows with the PM and the Power team, the people who brought me in, using real opportunity data instead of lorem ipsum. Real numbers are what make the gaps visible: a price, a target and a list of committed organizations force you to ask what happens when they don't add up. - $5.86 per MWh, the opportunity's max price - 100,000 MWh target for the window - 31 organizations it was shared with - What we started with: A confirm path and a cancel path. - What the walkthroughs added: **PO Target NOT reached** and **Cero Orders**: a window can close under its target and still be closable, or close with nobody in it. - What came last: **Confirm with Reconciliation**: the confirmed wholesale price doesn't match what the orders were placed at. It was the expensive one to find late. - Close it early: From the pilot requirements: if the demand is there, close the opportunity early and open a new one behind it. That's why Finalize Trade has two ways in, open or closed window. Action · design · 14 — Six endings, each with its own words: Each outcome is a full flow, and each one ends with a sentence someone had to write. The copy is where the operator learns what the system will and won't let them do with the money. - Confirm Wholesale Price: The agreed cost is unchanged; the field answers "The price remains unchanged." and the trade confirms at what buyers paid. - Confirm with Reconciliation: The agreed cost is lower; the price stack recomputes and the buyer's final price drops with it. - PO Target NOT reached: Finalize Trade is available while the window is open and under target. - Cero Orders: The panel reads "No orders placed yet", and the Finalize Trade modal blocks the confirmation: "At least one order is needed to confirm trade." Cancelling is still possible. - ERROR: Typing a cost above what buyers paid (6.88 against 4.80) stops the flow: "The Final Wholesale Commodity Cost cannot exceed the Initial Wholesale Commodity Cost." - Cancel Trade: "This action is final and cannot be undone." A required reason, picked from a closed list, lands on the buyer's card. ![Cero Orders (left): 0 of 100,000 MWh and Confirm Trade blocked until there is at least one order. ERROR (right): the final cost can't exceed what buyers already paid](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_3448,h_3049/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-04-cero-orders.png) ![Cero Orders (left): 0 of 100,000 MWh and Confirm Trade blocked until there is at least one order. ERROR (right): the final cost can't exceed what buyers already paid](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_6728,h_3049/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-05-error.png) Action · design · 14 — Five reasons to cancel, and no free text: The reason list is closed on purpose: the feature was first tested with a closed group, so the ways an opportunity could fail were known. Each reason is written for the buyer who will read it on their card, not for the operator: - Couldn't reach a price agreement with the Supplier - Supplier network couldn't source EACs in location, etc - Buyer no longer interested in proceeding with Schneider Electric - Volume of EACs no longer available in the market - EAC type no longer available due to Regulatory Changes On the grid, the first one becomes: "Unfortunately, we couldn't reach a price agreement with the Supplier. We will issue refunds for any orders that were placed." The reason and the refund arrive together, where the buyer already looks. ![PO Target NOT reached (top): two ways of starting the flow, with the window open or closed. Cancel Trade (bottom): Finalize → Cancel → the required reason → the cancelled panel](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_11360,h_2403/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-03-po-target-not-reached.png) ![PO Target NOT reached (top): two ways of starting the flow, with the window open or closed. Cancel Trade (bottom): Finalize → Cancel → the required reason → the cancelled panel](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_10339,h_2695/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-06-cancel-trade.png) Action · design · 15 — Reconciliation, the one that came late: At order time the buyer pays against a wholesale commodity cost. By the time the trade is confirmed, the cost agreed with the supplier may be lower. Reconciliation is not a screen you bolt on: it changes what the confirmation step is allowed to do, so **the whole Finalize Trade flow got a second version**. - First version: Two columns: "Enter the final wholesale commodity cost that was agreed at trade", with the cost the buyer paid ($4.80) as a reminder under the label. - Second version: The screen asks first: "Has the Wholesale Commodity Cost changed?", and only accepts a figure that is the same or below. - What shipped: One column: purchase price on top, final price below. The field starts empty, the stack recomputes live, and the old price stays visible, struck through. - **The arithmetic on screen:** Wholesale Commodity Cost 4.80 + Zeigo Fee 10% + RECA Fee 1% = Retail Price 5.33; then a Service Fee of 10% lands on a Final Price of **$5.86/MWh**. - **The only legal direction is down.** The final cost can only be equal to or below what the buyer paid, because the number may owe the buyer money, never bill them more. - **The refund falls out of the arithmetic** instead of out of a support ticket, and the operator sees the consequence before committing. ![The first version of the price step: two columns, an empty required field, and the Price Breakdown beside it](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-power/reconciliation-05-screen.png) ![Confirm with Reconciliation, end to end: the final price drops from $5.86 to $3.92 before the operator confirms](https://res.cloudinary.com/dcy607q9x/image/upload/c_crop,g_north,y_550,w_10421,h_2669/f_auto,q_auto,w_1600/portfolio/zeigo-power/close-02-confirm-with-reconciliation.png) Action · design · 16 — The rest of the state machine: Closing is the core, but a window is alive for days before it closes. Two more parts of the page carry state that touches money: orders, and who can see the opportunity. - Orders: The Orders tab has its statuses, menus, order details, a reject flow with its own error states, and notifications when a buyer places or cancels an order. The biggest section on the page is EAC Control's order detail. Rejecting is part of the design because an order is a commitment that can be turned down. - Access: An opportunity can be private or open, and there are full flows for Private → Open and Open → Private, plus sharing with more organizations. Changing who can see a live commitment changes what has already been committed. - Archive and drafts: Drafts can be deleted; confirmed or cancelled trades can be archived and unarchived. ![Orders tab, empty state · "There are no Incoming Orders" · search by order before there is anything to search](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-power/orders-tab-empty.png) Action · build · 17 — Build: the same hands, on Zeus: I built the Purchase Opportunities feature front to back, on Zeus components integrated into Power. Flow diagram → screens → build, with no handoff in between: the person who drew the six endings wrote the code that enforces them. - Stack: React + TypeScript on Next.js, on the Zeus design system. - What I shipped: The opportunity grid and its states, Opportunity Details, the commitment-window panel, the Orders tab with statuses, menus, rejection flow and errors, the checkout / Order Process, archive and drafts. - Power-side components: Form of Payment, Order Process, EAC Purchase Opportunities Card, BUYER and EAC Order List, Commitment Window List, High Level Details, Shared Organizations, PO Extra Information, EAC Type. - Where they live: The file's design system page: 108 components sitting on top of Zeus, so Power shipped **without forking the system**. The repo is private, so there is no code to show here. The design side is the 35-section page and the component set above. ![The grid built from one card component: Draft, open, closed, Trade Confirmed and cancelled with its reason, side by side](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-power/purchase-opportunities-all-states.png) Result · 18 — Results: Before and after the console, as tracked by the team. EAC Control stopped running windows outside the product. - Closing a commitment window: ~2 days → <15 min - Closing scenarios handled in product: 1 → 6 - Trade closings needing a support ticket: ~1 in 4 → ~1 in 20 Result · 18 — Where each number comes from - Time to close a window: ~2 days of email and spreadsheet reconciliation → **under 15 minutes** in the console · team tracking - Closing scenarios in product: 1 (happy path, the rest by support) → **6** · Figma and product - Organizations on one opportunity: Tracked by hand → **31 in product**, with their volumes · product data - Closings needing a support ticket: ~1 in 4 → **~1 in 20** · support tracking - Explaining the instrument: None in product → LoA + Green-e / CDP / RE100 blocks + an 8-question FAQ · product The reconciliation case in particular, where the confirmed wholesale price doesn't match the orders placed, went from a manual settlement to a screen. What it didn't fix is volume: the console works, but aggregated EAC purchasing never reached the scale it was built for. The console is internal and behind login; the before / after figures come from the team's and support's own tracking, with no public source to link. Result · 19 — Two ends of one journey: Power doesn't stand alone in the suite. Zeigo Activate's Renewables page recommends Energy Attribute Certificates as a decarbonization path; Power is where that recommendation gets executed. - Who uses it: EAC Control operators and the buying organizations on the platform. - What stayed reusable: The Power component set on Zeus: Order Process, Form of Payment, the order and commitment-window lists. - Why it matters for Zeus: A second product shipped on the system without forking it, which is what the token and logo work in Zeus was for. ![Zeigo Activate recommends EACs (left); Zeigo Power runs the purchase (right)](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-activate/renewables-projects-eac.png) ![Zeigo Activate recommends EACs (left); Zeigo Power runs the purchase (right)](https://res.cloudinary.com/dcy607q9x/image/upload/f_auto,q_auto,w_1600/portfolio/zeigo-power/opportunity-details.png) Result · 20 — What I'd do differently: Map the money before the screens. Every scenario I found late, reconciliation above all, was a question about what happens to a payment, not about a UI. If I ran it again, I'd write the settlement rules first and let the flows fall out of them. - The failure states were the feature. Six closing sections out of 35 is not defensive design; it's where the money is. - A written reason beats an error code. Deciding that the cancellation sentence belongs on the card, not in an email, was design work an engineer alone would have skipped. - Real numbers find gaps that wireframes hide. The target and zero-order cases only showed up when the walkthroughs used an actual price, target and list of organizations. - Good craft doesn't guarantee volume. The closing runs in product and the states are covered, and the market still didn't take off at the scale that justified it. **Where I feel most at home:** in code, because that's where I can build with the most creativity: try something, put it in front of real users and see if it holds. But what drives the work is understanding why we're building it. On Power, that meant learning a market before designing it. You can't draw the six ways a trade closes if you don't understand what money does in each one. --- All case studies: [https://www.exelobaiza.dev/work](https://www.exelobaiza.dev/work) (markdown mirror: [work.md](https://www.exelobaiza.dev/work.md)) ## Contact - LinkedIn: https://www.linkedin.com/in/exequiel-lobaiza/ - GitHub: https://github.com/exelobaiza